
Based on a recent market sensing conducted by Hilti, the results indicated that the average specifier does post-installed rebar connections every 2 out of 4 projects. The need for post-installed rebar designs stems from missing/damaged couplers and rebars and design changes. Navigating the post-installed rebar guidelines can be challenging as there are three European Assessment Documents (EAD) that cover rebar applications. Come join us in this webinar as we provide a comprehensive overview!
Sessions

Presentation material
Download