Skip to main content
Cart

Fire Protection in Hotel Construction and Maintenance - Malaysia Audience

Stay on the Safe Side

2-hour WEBINAR: In this live webinar, we will discuss the following: [1] Hotel construction and life cycle; [2] Codes and regulations in hotel construction; [3] Key needs of fire protection in hotel; [4] Key risk area [5] Typical applications of passive fire protection [6] Hilti’s solution. This webinar is with approved 2 CPD points from BEM and 1 CPD point from BAM.


 Sessions

Sorry, no results found.

Presentation material
Fire Protection in Hotel Construction and Maintenance - Malaysia Audience
Download