Skip to main content
Cart

Bond-Splitting Behaviour of Post-Installed Rebar: Part 1 of 2 - Malaysia Audience

Widen the scope of rebar application with new design method TR 069

Post-installed rebar connections have been offering a proven solution for post-installed concrete-to-concrete joints for decades. However, the scope of application has so far been limited by the design method according to EN 1992-1-1. A new design method namely TR 069, published in 2019 extends the area of application for post-installed rebars considerably and increases the flexibility in the design. Join this webinar to understand more on this recent advancement.


 Sessions

Sorry, no results found.

Presentation material
Bond-Splitting Behaviour of Post-Installed Rebar: Part 1 of 2 - Malaysia Audience
Download