UPDATEList Price Update Effective June 2026Learn More

Your Partner for Oil & Gas MRO Projects

Eliminate welding delays, reduce downtime, and boost efficiency with Hilti solutions built for safer, faster oil & gas maintenance operations.

Struggling with downtime, safety, and delays in MRO?

Hot Work Reduction

Eliminate On-Site Welding

Replace hazardous welding during shutdowns with engineered no-weld solutions for safer and more controlled execution
Critical Shutdown Pressure

Reduce Costly Downtime

Speed up turnaround execution and minimise lost production during critical refinery and offshore shutdowns
Execution Efficiency

Simplify On-Site Work

Reduce manual effort and delays with pre-engineered solutions and better access to technical support
Lifecycle Support

From Planning to Maintenance

End-to-end support from engineering design to execution and digital documentation for future maintenance efficiency
Hot Work Reduction

Eliminate On-Site Welding

Replace hazardous welding during shutdowns with engineered no-weld solutions for safer and more controlled execution
Critical Shutdown Pressure

Reduce Costly Downtime

Speed up turnaround execution and minimise lost production during critical refinery and offshore shutdowns
Execution Efficiency

Simplify On-Site Work

Reduce manual effort and delays with pre-engineered solutions and better access to technical support
Lifecycle Support

From Planning to Maintenance

End-to-end support from engineering design to execution and digital documentation for future maintenance efficiency
    MRO Project Support

    End-to-End Support for Oil & Gas MRO

    Oil & gas maintenance, repair, and operations (MRO) projects are critical to keeping facilities running safely and efficiently. Every turnaround or shutdown is time-sensitive, and delays can significantly impact operations. Hilti supports oil & gas customers across the entire MRO lifecycle — helping teams reduce complexity, improve execution, and maintain long-term reliability.

    Before Shutdown

    Planning & Engineering

    Hilti supports early-stage planning and pre-engineering to reduce uncertainty before shutdown execution.

    We provide engineered support to help ensure design readiness and execution efficiency, including:

    • Engineered solutions for anchoring and support applications

    • Structural calculations and technical support

    • Detailed drawings for planning and execution

    • BIM models to support digital coordination

    • Tailored logistics planning aligned to shutdown timelines

    • Pre-arranged stock availability based on project requirements

    This helps teams enter shutdown with clear execution plans, improved coordination, and reduced on-site risk.

    During Shutdown

    On-Site Execution & Installation

    During execution, Hilti supports on-site teams to help ensure installation is completed efficiently under tight shutdown timelines.

    Support includes:

    • On-site expertise and resident engineering support

    • Design change support during execution (if required)

    • Off-site prefabrication to reduce on-site workload

    • Cold work solutions (no-spark, no-welding applications) using engineered fastening systems

    • Mock-ups and installation guidance (where needed)

    • Pre-engineered kits to minimise on-site improvisation

    This helps teams spend less time troubleshooting and more time executing critical maintenance activities.

    The result? A smoother turnaround with right-first-time installation, fewer surprises, and improved execution efficiency under pressure.

    AFTER SHUTDOWN

    Digital Documentation & Lifecycle Support

    After maintenance work is completed, Hilti continues to support oil and gas teams through digital tools and lifecycle solutions that help improve future maintenance planning.

    This includes:

    • Asset management for tools and equipment

    • Firestop documentation and inspection software

    • Digital records to support compliance and traceability

    • Certified solutions designed to match the lifecycle of the structure, supported by international certifications such as ETA, UL, and offshore approvals

    These tools help teams maintain better documentation of completed work, making future maintenance cycles more efficient and easier to plan.

    By partnering with Hilti early, facility owners can develop more consistent standards and long-term solutions that improve outcomes across future MRO projects.

    Solving Real MRO Challenges

    5 Ways Hilti Transforms Oil & Gas MRO

    Oil & gas MRO projects come with high pressure, tight timelines, and complex site conditions. Hilti brings a suite of proven applications and engineered technologies that directly address these challenges — helping teams improve productivity, safety, and compliance in critical maintenance work.

    Structural Support Systems

    Weld-Free Modular Supports

    Hilti modular support systems use bolted, engineered components to support pipes, cable trays, and HVAC systems without on-site welding.

    • Fully engineered to project specifications

    • Pre-designed for faster installation

    • Helps reduce hot-work requirements during shutdowns

    Result: Faster, safer installation with reduced fabrication work on site

    Fastening Technology

    Direct Fastening on Steel

    Hilti fastening systems allow grating, handrails, and steel connections to be installed without welding.

    • Quick installation using specialised fastening tools

    • Avoids heat impact and structural weakening

    • Reduces time spent on welding preparation

    Result: Faster installation during shutdowns with improved on-site safety

    Sealing Penetrations for Fire-Rated Safety

    Passive Fire Protection Solutions

    Hilti firestop solutions seal cable, pipe, and duct penetrations to help maintain fire-rated barriers in oil & gas facilities.

    • Firestop coatings, sealants, and devices

    • Tested to international safety standards

    • Multi Cable Transit (MCT) systems for complex cable penetrations

    • Supported by documentation and inspection tools

    Result: Helps maintain compliance while improving site safety during MRO work

    Structural Reliability

    High-Performance Anchoring System for Critical Equipment

    Hilti anchoring systems support pipelines, pumps, and structural components in demanding oil & gas environments.

    • Mechanical and chemical anchor systems

    • Designed for high load, vibration, and seismic conditions

    • Supported by PROFIS Engineering design software

    Result: Reliable anchoring that meets technical and code requirements

    Productive Battery-Powered Construction Tools

    Cordless Tools for Faster MRO Execution

    Hilti Nuron battery-powered tools help improve productivity during maintenance and shutdown operations.

    • Cordless operation for greater mobility

    • Reduced setup time and fewer site constraints

    • Designed for heavy-duty MRO applications

    Result: Faster execution with improved workforce efficiency on site